The RVNG will be doing some chip sealing on September 25th and 26th. It will be in sections along Daniel Drive and the last 1.5km of Daniel Drive. Please watch for workers and drive slow.
The RVNG will be doing some chip sealing on September 25th and 26th. It will be in sections along Daniel Drive and the last 1.5km of Daniel Drive. Please watch for workers and drive slow.